Specifications include, but are not limited to: The work for the ECC, Lincoln Avenue, Jefferson, and Heritage Lane Pump Stations Upgrade Project consists the following work at each pump station location: ECC Pump Station: Replacement of the existing generator with a new 50kW diesel generator, relocation of the existing generator to the Jefferson Pump station, replacement of the ATS, replacing the existing extended-shaft vertical centrifugal pumps and motors with new dry pit submersible pumps, replacement of the associated equipment, piping and valves within the valve chamber, replacing the pump motor starters and control panel, and replacement of the pressure transducer and backup floats located within the wetwell. Lincoln Avenue Pump Station: Replacement of the existing diesel generator with a new 40kW diesel pad-mounted generator, replacement of the ATS, replacing the existing extended-shaft vertical centrifugal pumps and motors with new dry pit submersible pumps, replacement of the associated equipment, piping and valves within the valve chamber, replacing the pump motor starters and control panel, and replacement of the pressure transducer and backup floats located within the wetwell.