Specifications include, but are not limited to: The City of Lawrence seeks bids for the upgrades to the Chilled Water System at the Arlington Middle School and South Lawrence East Elementary School. All work shall be performed during normal business hours unless otherwise indicated. Final completion of the project shall be August 1, 2019. Supply and deliver one (1) Trane, or approved equal, water cooled chiller at Arlington Middle School and all associated work as further described in the plans and specifications. Replace (2) existing condenser water pumps, (2) existing chilled water pumps, valves, & controls as identified in the drawings and specifications. Supply and deliver a new (2) cell cooling tower, along with associated controls & piping as indicated on the plans. Complete factory overhaul of the existing Trane chiller at South Lawrence Elementary as identified in the contract documents. In addition, replace the following accessories with new, for the existing chiller: a. Refrigerant Monitor System b. Earthwise Purge c. Adaptive Frequency Drive d. Control Panel Supply and deliver new Cooling Tower and (2) Chilled Water Pumps at South Lawrence East Elementary School.