Specifications include, but are not limited to: 1.1.2.Lift must be specifically fabricated to withstand the harsh environments found at MBTA facilities, most notably a steam bay/wash bay application. 1.1.3.Services to be provided under this contract shall consist of removing existing lift, preparing any structure or substructure for installation and installations of all lift systems, wiring, piping, hydraulic system, and all mechanical, electrical equipment for operations. All lines, including but not limited to control wiring, wiring, hydraulic, pneumatic, etc, must all be run under the ground. 1.1.4.The work includes all labor, equipment and materials to complete the installations, including travel time, freight, service charges, parts, material and warranties to complete the installations. Also included in this work is the demolition, proper transport/disposal, and clean up where applicable. 1.1.5.The work under these specifications shall be “TURN-KEY" such as the contractor will be required to complete the required work without any assistance from the MBTA.