Specifications include, but are not limited to: Phase I. Conduct site visit and review background materials. Establish initial work plan and timeline. Review existing conditions and master planning opportunities and summarize findings. Discuss B and C by videoconference with SSU team. Phase 1 deliverables: workplan/timeline and findings of existing conditions and master planning opportunities. Phase 2. Evaluate low-carbon fuel options, technologies and strategies (e.g., building standards, load reduction). Determine preferred options for maintaining central plant, moving to building-specific systems, or a hybrid solution. Provide videoconference presentation(s) (via PowerPoint or similar) of several options addressing fuel source, technology, strategies and centralized/decentralized approach. Provide expected up front and operating costs. In consultation with Salem State, select at least three solutions to study in detail. Assess costs and benefits and provide interim and longer-term steps. Provide revised detailed workplan and final report template. Phase 2 deliverables: Videoconference presentation(s) and PowerPoint, report on options considered and finalist options selected, final report template and revised workplan.