Specifications include, but are not limited to: furnishing all necessary labor, materials and equipment required for the full depth construction and for the removal and immediate off-site disposal of 1-1/2” to 2” of bituminous concrete by coldplanning methods and overlay of 1-1/2” to 2” of SUPERPAVE asphalt. In addition, the contractor shall be expected to adjust castings, replace and shim unsuitable substructure, reset and install new curbing, construct ADA compliant curb ramps, reconstruct/construct driveways and sidewalks, and all other work as shown on the plans, as described in the Contract Documents (unless specifically indicated as not to be done), and as directed by the City Engineer. The work shall be performed at the intersection of Chestnut Street and Ellis Street, and along Woodward Street from west of the intersection with Bradford Rd to east of the intersection with Plymouth Rd, inclusive of the intersections. These locations are situated in Newton.