Evaluate the current flooring condition and measure the hallway dimensions. Choose appropriate flooring materials. Remove existing flooring, including adhesive or underlayment if necessary or skim coat Subfloor. Inspect and check the subfloor for any damage or unevenness. Repair or replace as needed. Lay down the new flooring according to manufacturer’s instructions, ensuring proper alignment and pattern. Install new 6” baseboards or trim to finish the edges and transitions between flooring and walls. Clean up the area, remove debris, and ensure all surfaces are properly sealed or finished. Perform a final inspection to ensure the installation meets quality standards and specifications. We will walk through the completed work, addressing any concerns or questions we may have. Removal and disposal of old flooring materials in the scope of work.