Specifications include, but are not limited to: On the first floora Community space including a Theatre, Artist workspaces,a Dancestudio, Multipurpose rooms, Woodworking shop,Café,Mechanical rooms, bathrooms and small office spaces•Second Floor is primarily rentable office space and the second floor of the theatre space.•ThirdFloor is rentable office space.•This projectis being designedto the City of Cambridge NET ZERO Action Plan.Photovoltaic systems are located on the roof. All mechanicaland electrical equipmentand building components are designed to becompliant with this plan and the building must achieve LEED Gold as a minimum.•This is a MGL c. 149A Construction Management at Risk project. The firm of WT Richhas been under contract with the City of Cambridge since November 2018. Presently they are performing pre-construction, abatement and demolitions services.•This project is located within a close residential neighborhood, the surrounding streets,many one-way,will make deliveries of materials a challenge to coordinate. •There will be street,sidewalk and underground utility modifications.•The project is estimatedto be 15-months in duration.•Construction and Public Safety is of primary concern. This site is located within a congested residential neighborhood.