Specifications include, but are not limited to: - Vendor to provide, Install and configure 2 new HP Servers with 256GB RAM, 2 SSD Drives, SSD Card and iLO . - Vendor to install / configure VMWare on both Servers. - Both Servers and SANs need to have redundant power. - Vendor to provide, Install and configure new and redundant MSA / SAN (60-80TB). We have about 40TB of Data right now. - Vendor to create redundancy (Connection wise) between Servers / SAN. - Vendor to Install VCenter to manage VMWare on the new infrastructure. - Vendor to migrate all Servers and Data onto new infrastructure. (most file are on Network shared drive – SMB Shares on Synology boxes (Btfrs file system), not Windows Servers). All Data need to be migrated onto Windows 2019 new File Servers. - Vendor to make sure users can access the new Files locations/ data (access both, their own Network files and Shared Network data). - Servers / SAN to be connected over 10GB Fiber. - Vendor to provide an Aruba/HP 54xx core switch with 10G ports. - Servers/SAN to be connected to Network over 10GB Connection. - Vendor to provide any 10GB needed hardware to accomplish the above requirements / connections. - Vendor to provide all power, fiber and data cables needed by all hardware. - We will need 3-years support on all hardware - Vendor to include Microsoft Windows Server Data Center as a part of this project. - Professional Services to install and configure all the above and to do Data migration to new infrastructure. - Project ending date is one week from start date (from when Servers / SAN are on site).