Specifications include, but are not limited to: A. The work to be done consists of a full renovation of designated spaces on the Lower Level, Upper Level, and exterior of Quinn Hall for the purpose of a new Infrastructure Hub, including new server racks, the relocation of existing servers and telephone equipment, new cooling, fire suppression and electrical equipment and structural modifications to serve this space as well as mechanical support spaces as indicated on the plans. B. The General Contractor shall furnish and do everything, except as otherwise provided by specific notations herein or on the drawings, necessary to complete the work in accordance with the Plans and Project Manual. He shall furnish all plant, labor, materials, supplies, tools, water, machinery, implements, light, power, transportation, and other facilities required, and do all work necessary for the complete execution and completion of the Contract, except that work or materials specifically stated to be done or furnished by others. C. All work and materials furnished and installed shall be of the best quality and workmanship, and to the satisfaction of the Architect. There shall be no defect in the work or the operation thereof due to inferior materials or the workman like placing of any part. The work under this contract shall be performed at such times as may be necessary to facilitate the orderly progress of the work. It is the intention of these Specifications and Plans to cover all work necessary and incidental to the completion of this project, including all trades, as shown on the drawings or specified. D. Contractor shall do all necessary cutting and patching of structural and finish work as necessary to provide the finished results shown on the Contract Drawings and as herein specified