Specifications include, but are not limited to: HOT MIX LAID IN PLACE - (MACHINE WORK FOR PARKING LOTS, SIDEWALKS & TRENCHES) a. City will be responsible for preparing trench saw cutting, disposal, compaction and binder course. Contractor shall be responsible for supplying small paving machine with operator and laborer. Trenches will vary in size from 125 sq. yds. to 500 sq. yds. Contractor shall be responsible for supplying hot mix laid in place at a +/- 1-1/2” thickness; ADJUSTMENT OF MANHOLES, CATCH-BASIN STRUCTURES AND WATER GATES a. Contractor shall cut the existing pavement or concrete with a saw or pneumatic hammer not less than 1 foot nor more than 2 feet around the outside diameter of the existing castings. All materials within the limit of the cut shall be excavated to a depth needed to adjust and install concrete collars.