Specifications include, but are not limited to: All streets will be completely reclaimed to a depth of two (2) to two and half (2 ½) times the thickness of the pavement, as directed by the Engineer in the field at the time of the work. Pavement thickness will be determined by measurement in the field onthe day of reclamation. All streets that will have berm, will be placed on the binder course prior to finish paving. The binder course on the street shall be paved an additional one (1) foot on either edge, of the finished width, allowing the berm to beplaced on the binder surface, and then locked in with the final course of pavement. Once the reclamation of the streets is completed rough/partial grading will be done to make the streets passableand all driveways accessible at the end of each day,fortraffic until work is completed on the street.