The Worcester Regional Airport program includes a comprehensive series of construction, rehabilitation, and modernization projects designed to enhance operational efficiency, safety, sustainability, and passenger experience. This airport will remain operational during this work. All work will maintain Worcester Airport Operations with minimal disruption. Key elements include the following. Refer to the attached map on Exhibit 5.1: • Construction of 190 parking spaces on airport property. (See Location A on Exhibit 5.1) • Rehabilitate Maintenance Road and public parking lots. (See Location B on Exhibit 5.1) • Upgrade the fire protection and fire alarm systems at the airport to meet current code. • Upgrade electrical capacity at the airport. • Design and construct the following based on Massport Infrastructure Condition Assessment (MICA) findings such as: o Replace failed exterior stair railing. o Repair damaged brickwork, fractured concrete, and damaged interior masonry finishes. o Replace deteriorated exterior sealants. o Prepare and paint exterior painted surfaces. o Remediate deterioration in the water pipe system, replace as required. o Repair roof top economizer, add economizer to HVAC system. o Replace plumbing fixtures and system with high-efficiency fixtures.