Specifications include, but are not limited to: Equipment and Services - A. 1 – FX 80 – Furnish & Install new Johnson Controls Facility Explorer Supervisor (FX80) with a 25 Device license. B. 1 - Boiler & Pump Controllers – Furnish & Install new CGM with XPM expansion controllers. Replace existing outdoor air & loop sensors. C. 1 - AHU-1 Controller – Furnish & Install new CGM with XPM expansion controllers. Replace existing Discharge, Return & Mixed Air Temp Sensors. D. 1 - AHU-2 Controller – Furnish & Install new CGM with XPM expansion controllers. Replace existing Discharge, Return & Mixed Air Temp Sensors. E. 5 - VAVs with Reheat – Furnish & install new Johnson Controls CVM Controller with built in Damper Actuator. Provide new space & discharge air temperature sensors. F. Daisy chain new BACnet (22/3 Shielded Cable) wire from the new FX80 to all the new controllers. G. Create programs for all new controllers. (Sequences will be reviewed with the customer prior to implementation.) H. Download programs & conduct a full point-to-point checkout of all I/O points. I. Create a new user interface with new & improved graphics. J. Configure trends & alarms on all applicable points. K. Create new usernames & passwords for customer. L. Commission & confirm the system is operational. M. Provide O&M with controller wiring diagrams & system architecture. N. Provide owners training. O. Balancing of HVAC system. Additional Terms & Conditions: A. Use existing panels & locations for new FX80. B. Customer shall provide network information & data connections. C. Any components found to be faulty during checkout will be documented for the owner. Repairs can be priced or preformed on a T&M basis. D. Customer will provide 120v power to new control panels.