Specifications include, but are not limited to: The Project consists of: • Replace all existing fixed / operable window units (in the 1947 building, non-gymnasium spaces) with new aluminum thermally broken window assemblies. Operable units, on the ground floor, shall be in-swing hopper type while the upper level windows shall be single hung. Existing clear finished interior trim to remain as-is. Provide exterior placed metal screens at all operable window locations. Provide pre-finished steel (side hinge operable) rock guards at all ground floor windows. Additionally, all windows in occupiable areas shall be provided with roller window shades. • Replace existing window units in the Gymnasium with new fixed translucent fiberglass sandwich panel assemblies • Replace all single leaf entry doors/frames with new fiberglass reinforced plastic doors (with aluminum skin facing) / pressed steel thermally-broken frame assemblies. Insulated glass vision lites will be provided at all door locations other than at mechanical and storage areas. • Replace all paired entry doors/frames at building entrance locations with new fiberglass reinforced plastic doors (with aluminum skin facing) / pressed steel thermally-broken frame assemblies. Insulated glass vision lites will be provided at all door locations other than at mechanical and storage areas. Additionally, as appropriate, all new frames will be provided with insulated glass vision lites (to match existing lites). • Provide new door hardware at all exterior door locations. • Re-connect the existing access control system as relevant door locations