1. Phased Demolition and Construction 2. Security System Upgrades 3. Replacement of existing doors where indicated 4. Renovated multi-user restrooms and new single user restrooms on Level 1 5. New Mother’s Room on Level 1 6. Preparation and Painting of the north façade, the two penthouses and the chimney on the roof 7. Interior painting 8. New hydraulic elevator serving 3 Levels 9. A new IT room on Level 3, and decommissioning of the existing IT Room on Level 2 10. Modification to the Emergency Electric Room on Level 1 11. New vacant tenant space on Level 2 12. New Single User ADA Restroom on Level 2 13. New aluminum storefront entrance vestibule & Airside storefront entrance 14. Renovation of the Main Lobby and corridor finishes 15. Fire protection System renovations 16. Mechanical System renovations 17. Plumbing System renovations including new water separator for elevator 18. New handrails at all existing egress stairs. 19. Modifications to existing exterior handrails at entrance ramp 20. New side entrance ramp with associated handrails. 21. Modification to ADA parking linework and signage along with curb cuts and asphalt paving 22. New Signage compliant with MPA standards