Specifications include, but are not limited to: The commencing of snowplowing must be authorized by a properlyauthorized city or school official. It should be noted that snow will notbe plowed until two or more inches are on the ground. However, if snow fallsovernight, all initial plowing to open up traffic arteries and walkways at allWestfield Public School sites must be completed by 7:00 A.M. each schoolday. This mandate also includes Head Start and Camp Togowauk/Russell Road fordaycare programs. All contractors must report to the DPW garage on PondersHollow Road before beginning their shifts and at the end of their shifts to signin and out on a "Hired Equipment Form" Contractors that do not do this are noteligible for payment.Weather conditions may be such that it will be deemed advisable to sand/saltany snowfall below one inch (below plowing requirements). Contractor mustcontact either the Westfield Public Schools Operations Director or MaintenanceForeman.6.The successful contractor(s) must have available equipment to remove snowat Westfield High School and Westfield Vocational Technical High Schoolupon the direction of the Director of Operations or Maintenance Foreman of theWestfield Public Schools. The size of the loader used must be specified. Snowplowing will include the following areas:a. All hardtop driveways, parking lots and play areas.b. All sidewalks on tree belts and sidewalks leading intoand around the school buildings.c. All fire lanes around schools as determined by the Director of Operations orMaintenance Foreman of Westfield Public Schools