SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to replace (2) pump head units, (1) ¼ slow close valve, (1) pressure temperature gage, and repair/replace adjacent piping as needed at USCG Base Cape Cod building 3159 in Bourne, MA 02542. 1.1.2 REQUIRED WORK: This list should not be considered complete. It represents the general items needed to complete the contract requirements. 1. The Contractor shall secure system. 2. The Contractor shall replace (2) pump head units. 3. The Contractor shall replace (1) ¼ slow close valve. 4. The Contractor shall replace (1) pressure temperature gage. 5. The Contractor shall repair/replace adjacent piping and electrical as needed. 6. All work shall be performed in accordance with applicable State and Federal regulations. 7. Electrical shall be provided by the Contractor in accordance with NFPA 70 National Electrical Code. All electrical work shall be straight, plumb, and level. Conduit shall be supported. 8. The Contractor shall perform system testing.
SEE SOW FOR FULL DETAILS