Specifications include, but are not limited to: provide hot winter paving mix for the Department of Public Works & Parks for the period of January 7, 2023 through January 6, 2024; Standard Top Course Type 1 Winter Hot Mix Picked Up At The Plant By The City , 750 TONS ; 1. Contractor shall furnish (hot) bituminous concrete paving mix during the winter months. The City realizes that hot mix may only be available a couple of days per week, weather permitting. Saturday availability of at least one awarded vendor is required. 2. Contractor is to deliver bituminous concrete paving mix as required into trucks owned, hired or designated for the purpose by the City of Worcester. Said trucks will be dispatched to the asphalt mixing plant and be positioned to receive the paving mix directly from the plant. The contractor may also be required to deliver mix to DPWP Street Operations, 29 Albany Street, Worcester, MA in heated body trucks. 3. Materials, composition and preparation of the mixtures and plant requirements shall conform to the standard specifications for highways and bridges, Mass DOT most recent edition.