1. Furnish all labor, services, materials, equipment, machinery, apparatus, appliances, tools, supplies, supervision, and all other incidentals items necessary to perform the following: a. Remove and Replace Main Exterior Door (Existing is Horton Linear Single Slide Door) with full breakout. Include options for: i. Automatic Operator & Weatherstrip ii. Frames iii. Doors and sidelites with vertical weather strip iv. Motion/presence sensor(s) v. Emergency breakaway vi. 2-point lock vii. 1” insulated clear tempered glass. viii. Active leaves b. Electrical i. Disconnect/Reconnect existing 110/120V connection to door system. 2. The Contractor is responsible for pulling all applicable permits. Permit fees shall be borne by the Contractor. 3. Owner to select final color of available doors/frames, etc.