The following is a list of test and inspection services, along with the attached Program of Structural Tests and Inspections, that are to be included as part of this proposal. Testing protocol is to be followed. The Engineer of Record for the specific discipline will determine the methodology. Soil and Earthwork Testing and Inspection: 1. Observe at all times while fill is being placed and compacted. The representative shall make an accurate record of the types of materials used, including grain-size curves, thickness of lifts, densities, percent compaction, type of compacting equipment and number of coverages, the use of water and other pertinent data per the Contract Documents. 2. Perform a sieve analysis for each type of fill (on-site and borrow) prior to placement of the fill. Repeat the sieve analyses when the source or appearance of the fill materials changes. 3. Perform Modified Proctor Test, for each type of fill (on-site and borrow). Observe and inspect the storage, placement and compaction of fill materials and perform field density tests on the fill materials at a frequency determined per the Contract Documents. 4. Verify that untested or non-conforming fills (on-site and borrow) are not used in the project. Substitutions include changing the source or nature of on-site and borrow material. 5. Perform all Soils and Earthwork Testing and Inspections in accordance with the Contract Documents and the Program of Structural Tests and Inspections. Bituminous Paving Testing and Inspection: 1. Soils Technician to perform all field compaction testing, as required. 2. Field Inspector to inspect Bituminous Paving: Inspection to include insuring preliminary paving surface is prepared for paving, checking of delivery temperature of paving mix, inspection of paving and rolling operation, and checking of pavement thickness. 3. Extraction of Bitumen for Mixture and Gradation Evaluation: 4. Field Technician and Coring Equipment for Pavement thickness evaluation. 5. Provide documentation that the temperature of the Asphalt meets the Contract Documents. 6. Provide Testing for Porous Pavement, Air -Void Content, and APTG compaction. 7. Perform all Bituminous Paving Testing and Inspections in accordance with the Contract Documents.