The scope of this work is as follows: Peer review services out-reach • Create and host up to 5 times a webinar to share this peer review service to the A/E and inspectional services community. Include in the training details of what is required for successful model intake; how to engage in the process; and what to expect Project data collection, management, analysis, and review: Initial intake and review. • In-take modelers’ TEDI energy models and design documents (drawings and specifications). • In-take envelope derating calculations and associated design documents. • Store and manage data in a shareable accessible format for team availability. • Review TEDI models and envelope calculations for conformance with project documents. • Review TEDI models and envelope calculations for compliance with TEDI and derating guidelines. • Review TEDI models and envelope calculations for conformance with other modeling and standard practice. • Communicate in writing and over zoom/teams call any necessary changes, characterized in terms of changes to conform to: project documentation; guidelines, or standard practice. Project data collection, management, analysis, and review: Final intake and review • In-take final TEDI energy models and envelope calculations which have been revised based on recommended changes above. • In-take final design documents (drawings and specifications) to verify final TEDI energy models and envelope calculations reflect most up to date design. • Conduct detailed review to confirm recommendations at initial intake have been implemented...