DEMOLITION /SITE PREPARATION R&D Exist Paved Areas 1000 SY $10.00 $10,000.00 Temporary Construction Fence 1700 LF $6.00 $10,200.00 Site Prep and Earthworks 3 Acre $30,000.00 $90,000.00 Erosion Control Device- Straw Wattles 1100 LF $7.00 $7,700.00 Tree and Stump Removal 10 EA. $1,000.00 $10,000.00 Tree Protection 8 EA. $200.00 $1,600.00 R&D Fence 1000 LF $8.00 $8,000.00 Construction Entrance & Tracking Pad 1 LS $5,000.00 $5,000.00 Misc. Demo 1 LS $5,000.00 $5,000.00 Construction Sign and Warnings 1 LS $2,500.00 $2,500.00 Subtotal: $150,000.00 ADA PARK PATHWAYS 6" Cement Concrete Paving 1320 SF $60.00 $79,200.00 4" Asphalt- Pathways 200 Ton $220.00 $44,000.00 4" Asphalt- Parking Lot 400 Ton $220.00 $88,000.00 6" Vertical Granite Curb 1425 LF $60.00 $85,500.00 6" Gravel Borrow 1426 CY $50.00 $71,300.00 6" Ordinary Borrow 1425 CY $40.00 $57,000.00 Subtotal: $425,000.00