A. Work in the General Construction Contract includes, but is not limited to, the following: 1. Selective demolition. 2. Interior construction, including metal stud partitions and doors. 3. Interior finishes including interior architectural woodwork. 4. Installation of Owner furnished items 5. Joint sealants. B. Temporary facilities and controls in the General Construction Contract include, but are not limited to, the following: 1. Temporary facilities and controls that are not otherwise specifically assigned to Filed Subcontractors as indicated in Division 01 Section “Temporary Facilities and Controls.” 2. Unpiped temporary toilet fixtures, wash facilities, and drinking water facilities, including disposable supplies. 3. Project identification and temporary signs. 4. General waste disposal facilities. 5. Pest control. 6. Temporary fire-protection facilities. 7. Barricades, warning signs, and lights. 8. Security enclosure and lockup. 9. Environmental protection. 10. Restoration of Owner's existing facilities used as temporary facilities. 1.8 FILED SUBCONTRACTS A. General: All Filed Subcontractors are required to review all Drawings for information as it relates to conditions of the Work for proper phasing, coordination, and execution of the Work. 1. Specification Sections included in each Filed Sub Bid category may contain additional scope requirements as referenced in separate Specification Sections. 2. The Contractor and each Filed Subcontractor must review and incorporate all Addenda items into the Contract Documents, and respective scopes of Work. B. The Project includes the following Filed Sub-Bid categories and related Specification Sections. Refer to the Table of Contents and Divisions 03 through 26 for Filed Sub Bid Specification Sections. 1. Resilient Flooring Filed Sub Bid – 09 00 02. 2. Painting Filed Sub Bid – 09 00 03