Specifications include, but are not limited to: A. Spring Clean Up: Month of April 1. Removal of winter debris from lawns, beds, walks, driveways, loading dock area, plaza and platform, etc. and perimeter of property.; 2. Prune winterkill from all flower beds; 3. Power edge curbs and walks.; B. Lawn and General Maintenance: Weekly – May through October 1. Mowing/ Trimming/Blower maintenance must be performed in a way to ensure that all users are protected; all machines, equipment and blowers must be idle when users are encountered see GENERAL CONDITIONS.; 2. Mowing of all Grass Areas Once per week during the period of and as needed per the WRA’s discretion during the remaining months; 3. Prior to performing any mowing or trimming Contractor will need to remove any litter or debris that may be cut up and then spread throughout the area or thrown into adjacent areas or surfaces; C. Irrigation System: Mid to end of May - End of October 1. Spring startup of system.; 2. Adjustment of clocks when necessary.; 3. Replace or repair broken sprinkler heads caused from work performed by landscaping crews.; 1. The Contractor shall begin and perform efficient snow removal operations from infrastructure using appropriate equipment to eliminate stockpiles/stacking that obscure or impede public rights of ways, crosswalks, driveways, parking, walkways, driveways, as further described below.; a. The Contractor shall commence snow removal operations at the earliest opportunity. Removal may be scheduled to occur concurrent with and during an active storm as appropriate based on duration and intensity and the progress of clearing. However, removal shall be completed no later than 24 hours after snow stops. The Contractor shall satisfactorily remove all snow displaced from snow management operations from the hard surfaces and areas within 24 hours upon stoppage in snow fall.; 2. The Contractor shall not pile snow higher than two feet near line of sight at or near intersections of traffic lanes and/or cross walks. Any stockpiled snow exceeding 2 feet shall be cleared at the contractor’s expense.; 3. The Contractor is responsible for keeping all driveway entrances and exits, as well as sidewalks open to intersection crossings, free of snow at all times. The narrow walks behind fixed appurtenances, inaccessible for equipment clearing, shall be cleared using hand methods.