GENERAL A. Deliver all materials in the original packages, containers, or bundles bearing the name of the manufacturer and the brand name and product technical description. B. All materials or equipment delivered to the site shall be unloaded, temporarily stored, and transferred to the work area in a manner that shall not interfere with operation of others at the facility, or employee's access and safety. C. Damaged or deteriorated materials shall not be used and shall be promptly removed from the premises. Materials that become contaminated with asbestoscontaining material shall be thoroughly cleaned, or sealed in plastic bags or sheeting, labeled, and legally disposed of in an approved, secure landfill. D. All materials and equipment shall comply, at a minimum, with all sections of this specification, relevant federal, state, and applicable local codes, and industry standards. 2.2 ABATEMENT EQUIPMENT & SUPPLIES A. HEPA-Filtered Exhausts: For full negative pressure containments, air inside each work area shall be exhausted through a High Efficiency Particulate Air (HEPA) filter. Commercially manufactured HEPA-filtered exhaust units, with specification plates intact, must be provided for each work area to attain, at a minimum, four air volume changes per hour and an inward flow rate of clean air into each work area at the Decontamination Facility of at least 100 feet per minute. The HEPA filter shall be preceded by replaceable prefilters, and the unit must be designed so that it cannot be operated unless all filters are in place. The units must also be designed with a gauge to indicate the pressure drop across filters, and lights or audible alarms to indicate that the filters are properly installed, functional, and when they must be changed. Flexible ducting shall be required to allow exhausting to the exterior of the building. B. The Contractor shall have available and use recording manometers to monitor pressure differential between the work area and occupied areas of the building. A minimum negative pressure differential of 0.02 inches of water column shall be maintained. C. The Contractor will have reserve exhaust air filtration system units in order to maintain negative air filtration in the event that a unit malfunctions during use. D. Vacuum units, of suitable size and capacities for project, shall have HEPA filter(s) capable of trapping and retaining at least 99.97 percent of all monodispersed particles of 0.3 micrometers in diameter or larger. E. Fire retardant polyethylene sheeting in a roll size to minimize the frequency of joints shall be delivered to job site with factory label indicating a minimum of 6- mil, unless regulations dictate otherwise. Contractor is responsible for determining if fire rated polyethylene sheeting is required by State or local Fire Marshal.