The project includes furnishing all labor, equipment, materials, and incidentals required to retrofit the existing Fisher Street Water Treatment Plant to include replacement of the ozone/ultrafiltration membranes for treatment of iron and manganese with pressurized manganese greensand vessels, modifications to the existing chemical storage area, replacement of the existing HVAC equipment, well pumps and associated VFDs, backwash supply pumps, modifications to the existing subslab tanks and integration with the existing SCADA system. The project also includes furnishing all labor, equipment, materials, and incidentals required to construct a new PFAS treatment facility capable of treating up to 1.2 million gallons per day when all treatment vessels are operated in series. The facility is an addition to the existing Fisher St WTP and includes concrete work, two granular activated carbon (GAC) vessels, building construction, and associated HVAC, plumbing, electrical, and instrumentation and control (SCADA) work.