Installation of approximately 200 linear feet of new 12”, 8”, and 6” CLDI water main sections and fittings. 2. Cleaning and lining of approximately 1,400 linear feet of existing 6” cast iron water main. 3. Installation of hydrants, gate valves, and all other related appurtenances. 4. Installation of temporary water main servicing residential areas. All temporary connections and reconnections. 5. Replacement of water services and sewer services. 6. Cleaning, CCTV inspection, approximately 6,300 linear feet of sewer and drain main of various diameters. 7. CIPP Lining of approximately 2,000 linear feet of sewer main of various diameters. 8. Point repairs, both open cut and trenchless of sewer and drainage systems as required. 9. Reconstruction of approximately 1,700 linear feet of roadway including new granite curbing, granite curb wall, concrete sidewalks, driveway aprons and concrete wheelchair ramps. 10. Mill & overlay of approximately 5,500 linear feet of roadway