Specifications include, but are not limited to: Install 5 completed interpretive panels at the summit of Wachusett Mountain. Panels, frames, mounting and hardware will be provided. Design, fabrication and installation of 6 interpretive elements as outlined in the construction plan. Construction of stone walls to complete summit panel installation as outlined in the construction plan. (requires masonry work) Fabricate and install a bronze plaque describing the Summit Houses. Fabricate and install 4 view-shed panels entitled Cataloging the View along the Fire Tower based on specifications provided. All mounting, hardware must be purchased. Interpretive and graphic design work may be required to complete elements of this project. Construction plans were completed by a previous vendor and will be provided.