The Scope of work includes, but is not limited to: 1. Replace all existing gas fired space and domestic water heating equipment with properly sized air source heat pump (ASHP) equipment. 2. Vacate and cap all unused gas piping. 3. The removal of all unused gas fired equipment and associated piping and pumps. 4. Provide heat loss calculations supporting the sizes of the selected equipment including the individual unit ASP and the domestic hot water ASHP. 5. Determine if ASHP water heaters are the best approach. 6. Provide electrical load calculations to determine the required sizes for the unit load centers and the building main distribution panel (MDP) as well as the house panel. 7. Provide new electrical risers, sized as required to support new electrical loads. 8. Provide new electrical outlets as required to support the new electrical equipment. 9. Provide all patching and painting as required. 10. Perform all required asbestos testing.