The project generally consists of the installation of a 79’ long pile supported concrete pedestrian walkway addition along the southern end of the South Jog. The project includes, but is not limited to, the demolition of an existing gangway platform, the construction of a new reinforced concrete pedestrian walkway supported by SYP CCA treated timber piles and a combination of stainless steel and fiberglass reinforced plastic structural members and includes a timber whale and timber chock fender system. The existing gangway assembly will be reinstalled on the new walkway and handrail will be constructed along the length of the walkway. A 19’ long concrete foundation wall will be constructed, extending the southern wall of the South Jog landward. A Tensar Marine Mattress will be installed at the base of the new foundation wall. In addition to the piles utilized to support the walkway, an additional pile and mounting assembly will be installed for the purposes of supporting a (owner installed) jib crane. Other aspects of the project include, but are not limited to, excavation and backfill, walkway area painting, repair of a washed out section of the asphalt parking lot, and installation of additional guardrail.