• The scope of the work includes labor, material and equipment to clean of ALL catch basins in Town, roughly 2,200 CB’s. Contractor will not be responsible for removal of material and asked to dump material in one location. Work will begin early November (2025) and MUST be completed by December 31, 2025 (weather dependent). Exact schedule will be determined by the Town based on weather. Quote should be supplied price per catch basin. • Contractor is required to track materials removed and material levels in catch basins as well as any other additional information requested by the Town. Tablets will be provided to track the required information. • Failure to complete the work included in this contract shall expose the contractor to charges. Charges will accumulate on a daily basis in addition to costs for traffic control required after the stated completion date. • If the vendor fails to supply and/or deliver in time to meet the requirements of the Town, the Town reserves the right to obtain these services from another source. Any additional costs incurred by the Town as a result of a price differential between the price paid on the open market and the contract price will be charged against the contractor or deducted from any balance owed to the contractor. • All quotes must be firm and continue in effect for a period of thirty (30) days from date of submittal.