Project Scope Area 1 includes the following: o Reconfiguration of Terminal C Main Checkpoint to facilitate an increase in passenger queuing capacity, and potentially screening throughput and capacity. o Creation of a new Club Shell for fit-out (by others) in existing concessions space Project Scope Area 2 includes the following: o Creation of a new two-story Club Shell for fit-out (by others) above existing C3 Bag Room. o Architectural, Mechanical, Electrical, and Plumbing improvements in the vicinity of the C3 Bag Room, C11 Hold Room, C10 Hold Room, and concourse areas. o Relocation and replacement of an operationally critical electric substation in the vicinity of the C3 Bag Room. o Expansion of the C10 Hold Room to facilitate an improved passenger experience related to queueing and circulation. o Photovoltaic façade system o Green roof system Project Scope Area 3 includes the following: o Extension of existing Federal Inspection Services (FIS) corridor from Gate C7 to Gate C8 for international arrivals. o Improvements to and reconfiguration of the existing Concourse and Hold Rooms at Gates E1, E2, & E3. o General building conditions improvements in the existing Terminal C, and Terminal C vicinity, including but not limited to full or partial replacement of HVAC systems, full or partial replacement of critical electrical infrastructure, and/or full or partial replacement of plumbing systems, as identified by the Architect/Engineer. o Pre-security connection from new Transportation Center (by others) to Terminal C on arrivals level. The construction of the new garage connection will require careful phasing to ensure airport operations will not be interrupted. o Pre-security passenger circulation, Security Badge Office relocation. o New Universal Changing Room(s), Pet Relief(s), Mother’s Room(s). o Terminal C Pier A Roof improvement. o Photovoltaic façade system and curtainwall system o Green roof system o Roof-mounted solar panel array