The purpose of this project is to redesign the Broadway corridor into a Complete Street with dedicated facilities for all transportation modes. The consultant will work with the Town and the community to develop a project design that is advanced into construction ready documents. The consultant will design, prepare construction plans, specifications, construction cost estimates, prepare and obtain all required permits and approvals as necessary, and provide bidding and construction phase services for the project in accordance with all MassDOT and FHWA requirements. The ultimate goal is to have the project constructed with funding through the Boston MPO’s Transportation Improvement Program (TIP). The design fee shall not exceed $1,395,000.00.