This project at Bridgewater State University Greenhouse involves replacing the existing Link4 environmental control system with a new, fully integrated, brand-agnostic system capable of automating temperature, humidity, ventilation, and lighting across multiple zones. The work includes safe removal and disposal of the current system, installation of new control components compatible with existing infrastructure, and coordination with licensed trades for system integration. The contractor will also be responsible for commissioning the system, ensuring full functionality, and providing comprehensive documentation and training for greenhouse staff. Deliverables include a fully operational system, a final commissioning report, and a training.