Specifications include, but are not limited to: 1. Two (2)softball ball fields a. All components of the Softball Field Construction including but not limited to: i. Remove and stock pile top soil ii. Prep subgrade for infield installation iii. Softball Field Construction, including Grading, Backstop, portable bleachers, iv. Solar Scoreboard v. New Utilitiesincluding water and electrical for irrigation vi. Stonedustsidewalks and steel edging vii. Sporta Fence wheeled outfield fence viii. Sand Slit Drainage and overseeding ix. Wetland restoration planting 2. Completeness: The Work shall be as shown on the Drawings and be complete in every respect and in conformance with all applicable requirements of governing laws and codes.