RENOVATION GOAL: The selected firm will provide qualified design services and creative problem solving on how to renovate spaces most effectively and sustainably in 100-year-old buildings with knowledge of new and evolving technologies and shall have experience in providing such services in schools. Note that charter schools are not required to follow the same guidelines as typical public schools and may have alternative goals for space and programmatic elements. SCOPE OF PROJECT: The following scope should be included in schematic design services. Final scope to be designed through construction drawings and bidding is dependent upon budget set after schematic design. The remaining scope will be implemented in a future construction phase. 10 New Bond Street/High School Facility: 1. Fit out of 29,000 square feet of vacant, unfinished warehouse space to relocate 7th grade students from the Middle School into this building for a Junior/Senior high school model. To accommodate ~120 additional students, the fit-out will include 12-16 new classrooms, additional cafeteria space, a second gymnasium and additional bathrooms. The building will be occupied during construction. 2. Roof replacement 3. Building wide security upgrades 6 New Bond Street/Middle School Facility: 1. The renovation of the 17,500 lower level which currently consists of a cafeteria, warming kitchen, music room and the attached vacant former biomedical lab space to optimize use of the kitchen and enlarge the cafeteria to create additional multi-purpose space 2. Deferred maintenance repairs to the building plumbing system 3. Conversion of the current HVAC system to electrical air source heat pump system