Specifications include, but are not limited to: FURNISHING AND INSTALLING ONE (1) 40,000 BARREL (80-FOOT DIAMETER BY 48-FT HIGH) JET-A FUEL ABOVE GROUND STORAGE TANK. THE TANK SHALL BE STEEL AND SHALL BE CONSTRUCTED ACCORDING TO THE API 650 REQUIREMENTS. THE WORK INCLUDES THE INSTALLATION OF ALL FUEL PIPING, FIRE PROTECTION SYSTEMS, INSTRUMENTATION, CONTROLS, CATHODIC PROTECTION AND OTHER APPURTENANT SYSTEMS. THE TANK SHALL BE CONNECTED TO THE EXISTING PIPING, INSTRUMENTATION AND IN THE CONTROL SYSTEMS IN THE EXISTING TANK 4 CONTAINMENT AREA AND EXISTING OPERATIONS BUILDING. THE WORK ALSO INCLUDES, CONSTRUCTING REINFORCED CONCRETE CONTAINMENT WALLS; FURNISHING AND INSTALLING FIVE (5) GALVANIZED STEEL ACCESS STAIRS AND THREE (3) STEEL ACCESS DOORS WITH THE ASSOCIATED ACCESS CONTROL SYSTEM (ACS) AND SECURITY SYSTEMS; FURNISHING AND INSTALLING CHAIN LINK FENCES WITH BARBED WIRE AND CHAIN LINK FENCE GATES; RESTORATION OF CEMENT CONCRETE SIDEWALKS; REMOVAL AND STORAGE OF PRECAST CONCRETE SECURITY WALL SECTIONS; FURNISHING AND INSTALLING ELECTRICAL SYSTEMS, EXTERIOR LIGHTING AND LIGHTNING PROTECTION AND FURNISHING AND INSTALLING ELECTRICAL CONNECTIONS ASSOCIATED WITH THE JET FUEL SYSTEM. FURNISH AND INSTALL ALL APPURTENANT WORK IN ACCORDANCE WITH THE DETAILS SHOWN IN THE CONTRACT DOCUMENTS.