2.2. Interior A. Electrician to confirm all outlets are functioning properly; replace, as required. B. Remove and replace hallway ceiling mounted light fixtures (one (1) light). Repair ceiling, as required. Install LED lightbulbs. (L- 1; L-5) C. Remove and replace kitchen ceiling mounted light fixtures (one (1) light). Install LED lightbulbs. Repair ceiling, as required. Install dimmer switch. Install LED lightbulbs. (L- 1; L- 5) D. Remove and replace dining room ceiling mounted light fixtures (one (1) light). Repair ceiling, as required. Install LED lightbulbs. (L- 2; L- 5) E. Remove and replace bedroom closet light fixture. Modify electrical, as required, to install light switch. Install LED lightbulbs. (L- 3; L- 6) F. Remove and replace all outlet and switch covers. • Fifteen (15) double plug outlet covers; two (2) cable box covers; two (2) phone jack outlet cover; six (6) single switch plate covers; three (3) double switch plate covers; two (2) 2-gang 1-toggle duplex wall plate covers. Contractor to confirm count/type of outlet and switch covers. Builder’s choice, white. G. Replace thermostat with energy star thermostat (AP- 2). H. Replace window blinds for three (3) windows and one (1) sliding glass door. Contractor responsible for confirming blind dimensions. (BL- 1, BL- 2, BL- 3, BL-4) • Blind 1 (BL- 1, bedroom window): 58” x 46”; • Blind 2 (BL- 2, living room sliding door): 72” x 80” • Blind 3 (BL- 3, living room window): 46” x 46” • Blind 4 (BL- 4, dining room window): 45” x 45” I. Repair/replace <15 ft2 of damaged laminate flooring in dining room and bedroom. Matching flooring to be provided. J. Install 72” transition strip between laminate flooring and sliding glass door in living room. Color to match existing flooring. Builder’s choice. K. Repair bedroom door; ensure that it closes properly. L. Replace deadbolts on two (2) entry doors (CK- 1). M. Remove six (6) HVAC wall grates – sand; primer, paint (PT- 1; PT-4). N. All rooms, hallways, and closets. Remove hooks, nails, and screws. Remove loose and/or peeling paint. Patch and repair walls and trim. Patch and repair ceilings, as required; repair/replace missing popcorn ceiling finish; apply stain block, as required. O. Apply primer to all rooms, hallways, and closets (1250 ft2 ). Contractor responsible for confirming room dimensions (PT-1). P. Paint ceilings in all rooms, hallways, and closets, two (2) coats (745 ft2 ). Contractor responsible for confirming room dimensions (PT-2). Q. Paint walls in all rooms, hallways, and closets, two (2) coats (1250 ft2 ). Contractor responsible for confirming room dimensions (PT- 3). R. Apply primer to all doors, trim, and wooden shelving in all rooms, hallways, and closets. (PT- 1). S. Paint doors, trim, and wooden shelving in all rooms, hallways, and closets, two (2) coats. (PT- 4).