Specifications include, but are not limited to: The Contractor shall furnish all labor, materials, supervision, management, tools and equipment necessary to provide the Scope of Work. The project is located within (5) First Floor Dorms (+/-2,590 SF per dorm), the first floor Hallways leading to the dorms (+/-1,748 SF and +/-898 SF), and the First Floor Laundry Room (+/-486 SF); refer to the drawings for the location of the scope of work. The Scope of Work shall be completed in Two Phases and includes but is not limited to: • All floor covers (outlets, expansion joints, etc) to be removed prior to demolition and abatement; install temporary protection for these locations during demolition and installation; and re-install floor covers to original locations after installation • Abatement of Asbestos Flooring performed by Licensed Asbestos Abatement Personnel With commercial liability insurance • Comply with all OSHA, EPA, MDE and other State Requirements regarding Abatement • Provide containment to comply with EPA and MDE regulations