Specifications include, but are not limited to: The work to be done under this contract shall include but not limited to the furnishing of all materials, parts and labor to repair specifically defined deficiencies previously cited by an independent inspection agency and recognized by MDE. Repairs must meet MDE UST regulation to include all necessary testing and certification for compliance, and be consistent with industry standards. Documentation of repairs and testing will be provided to the Regional Maintenance Manager by the awarded contractor at completion of contract. The following defines the specific repairs needed. Tank # 32- 2500 gallon UST: install new gravity overfill drop tube. Tank # 35- 1000 gallon UST: replace ATG sump sensor grommets and sensor. Tank # 62 fuel dispenser: 1000 gallon UST: replace fuel meter and solenoid. Tank # 62- 1000 Gallon UST: install new straight drop tube Tank # 66- 2500 gallon UST: replace existing sump top hat, manway, and lid with MDE compliant materials, to include all demolition and restoration. Tank # 67- 600 gallon UST: replace interstitial riser cap with new. Tank # 68- 600 gallon UST: replace interstitial riser cap with new. Tank # 73- 600 gallon UST: replace interstitial riser cap with new. Tank # 77- 10000 gallon UST: replace transition sump vent boot and bulb at external alarm.