Specifications include, but are not limited to: The objective of this Invitation for Bid is for the University of Maryland, Baltimore (herein referred to as the University) to select a Qualified Contractor to to furnish labor, materials, equipment, supplies, supervision, subcontracting and other necessary resources as required to build the Ductbank for future BGE and Campus 13kV Feeders to/from future North Electric Station at the University of Maryland, Baltimore. A. Work provided by the contractor for this project includes underground ductbank installation including all excavation and restoration for two areas: 1. Portions of incoming ductbank from BGE Paca Street substation along Martin Luther King Jr. Blvd. to an existing manhole outside of the existing UMB Recycling Center on Saratoga Street. The ductbank will connect to a number of existing Baltimore City owned manholes that carry BGE electrical feeders. 2. Ductbank crossing and manhole at Baltimore Street including building connections to HSF-I, MSTF, and Howard Hall. 3. Electrical feeder installation will be installed under a future project and is not included in this scope of work.