1. Install a total of 84 data drops at various campus building locations. Note that the campus is made up of eight (8) individual buildings connected by hallways, as if one building. The drops will be run between the designated switch in each individual building and the drop room/location inside that building. There are no drop locations in the hallways. 2. Be responsible for performing cable continuity and Quality of Service (QoS) testing in building locations where drops are to be installed. Cables to be tested and replaced may be located in brick walls, conduit, and/or drop ceilings. 3. Be responsible for the proper cutting, removal, disposal, and replacement of any identified cables. All replacement cables shall be Cat6. 4. Ensure that wherever holes are made, the cabling vendor must seal them with HILTI- Flexible Fire Stop Sealant: CP606. 5. Be responsible for contacting the Delivery Address POC listed in Section 3 in writing with any questions, concerns, issues, or recommendations based on any findings that are not consistent with the scope defined in this PORFP.