Specifications include, but are not limited to: Annual Fire Pump Flow Test 2.2.1.1.1 Test to be conducted in accordance with N.F.P.A. 25. 2.2.1.1.2 Test shall be conducted under minimum, rated and peak flows of the pump by controlling the quantity of water discharged through approved test devices. 2.2.1.1.3 Check relief valve for proper operation to discharge water. Oriole Park, M & T Bank Stadium & Warehouse testing to be conducted during off hours (Saturday) or in conjunction with Flow & Tamper Test or at the discretion of the MSA Camden Station Fire Pump must be tested during Flow and Tamper test due to building access. 2.2.1.1.4 Record tested results and turn over to MSA within three (3) weeks of testing date. (sample form attached in Exhibit II- below). 2.2.1.1.5 Successful bidder to have two technicians on site during testing.