Specifications include, but are not limited to: The Contractor shall furnish all labor, materials, supervision, management, tools and equipment necessary to provide the Work. The facility is divided into three (3) pods, Pod-1, Pod-2 and Pod-3. Each pod has two (2) floors and each floor is labeled as Housing Units A to F, each housing unit is divided into 4 quadrants. Typically there are 4 showers on each housing unit, one on each quadrant. Refer to drawings for details. There are 23 showers and 1 shower area with 2 shower stalls. Scope of Work includes but is not limited to: • Removing existing plumbing fixtures, mechanical vent grills, light fixtures, shower curtains, shelving etc. in all showers and shower area. • Removing and disposing of existing tiles and mortar from the floor, step and wall surfaces of all showers. • Clean and prepare the interior floor, wall and ceiling surfaces of the showers and the shower area, patch existing holes to create smooth surfaces ready to receive finish per the manufacturer’s requirements. • Furnish and install seamless shower system in all 23 showers and one accessible shower area in accordance with the seamless shower system manufactures installation requirements. • There are three seamless shower systems that are approved to be installed in this project: 1 - Prime Coat Coatings Systems - Seamless Shower System 5130. (Basis of Design) 2 - Milamar Coating, LLC - ICO-Glaze System. 3 - Tnemec Company, Inc - Broadcast Resinous Epoxy Floor Coating System. • Substitution of the product or manufacturer is NOT allowed. . • The Seamless system shall have a 5-year warranty as required by the IFB. • Re-install all plumbing fixtures, mechanical vent grills, light fixtures, shelving etc. to their original place. Refer to drawing sheet A03 for detail scope on each fixture type. • The project is required to be done is phases, only 2 showers in one housing unit can be worked on at one time, leaving 2 showers operational for the inmates. The contractor shall coordinate the phasing with the Facility