Specifications include, but are not limited to: •Demolition work consists of removing the existing genset, 4-100AS switches, abandoned medium voltage transformer and associated conduit and wiring in accordance with the contract documents.•Installation of replacement equipment includes installation of a new 200kW, 480/277V generator with a 400 gallon skid mounted fuel tank, 1-300A ATS, 1-100ATS, 400A panel and associated conduit and wiring. •Contractor is responsible for all testing of Genset and ATS equipment, with work overseen by a member of the Hagerstown Maintenance Department at the completion of the repairs.•Contractor shall perform all work during normal business hours, Monday thru Friday, excluding holidays and weekends between the hours of 6:00am and 2:30pm. •Contractor is responsible for furnishing, installing and the replacement of items listed in Section B of this Scope of Work. •Contractor is responsible for the daily clean-up, removal, and hauling of all work related material(s) and debris off site legally. •Contractor will be responsible to provide a warranty afor all parts and labor for a period of one to two years from the date of Substantial Completion.