Specifications include, but are not limited to: Phased Construction for the following: a. Installation of temporary facilities, temporary utilities, temporary and permanent security fences and temporary access roads b. Construction of utilities as indicated or specified, including power distribution system, temporary and permanent security fencing, security system, and all other incidental work. 1. A new PLC based lock control system including visual touch screen controls and monitors. 2. New fiber optic communication cabling 3. New 120V power circuits as needed. 4. New rack style UPS units with battery backup. The goal of this project is to provide new door controls systems. The systems shall be integrated by a single Electronic Systems Integrator (ESC). New fiber optic cable will be provided where shown to carry signals as needed for the door controls system. The existing manhole system should have capacity for this new fiber optic cable, but unit prices will need to be provided in case new conduits are needed on site. New PLCs will be provided as well as equipment racks, I/O modules, touch screens, monitors, etc. New 120V circuits will be provided for this equipment as needed. In some cases where inadequate 120V circuits exist, new panels will be provided. All 120V power must originate from Priority 1 Power. Coordinate all 120V power work with the owner to ensure it is Priority 1 (it is the highest priority power in the facility load shedding scheme). New rack mount UPSs will be provided for all touch screens, CPUs, and remote I/O panels.