Specifications include, but are not limited to: Remove existing tiles and setting bed from the floor and wall to facilitate installation of new CMU knee wall. See drawing A02 • Remove existing shower fixture. Existing piping to remain. Utilize and modify, as required, existing piping for the new ADA shower fixture. • Furnish and install ADA grab bars to manufacturer’s specifications and to ADA Standards. Manufacturer: Cornerstone Detention, Acorn Engineering, Whitehall Manufacturing. See A03 for Equipment Specifications. • Furnish and install ADA single station surface mounted shower fixture to manufacturer’s specifications and ADA Standards. Maintain a 4” offset above grab bars. Manufacturer: Acorn Engineering APEX 450BADAWH or equivalent. See A03 for Equipment Specifications. • Furnish and install 12” concrete “cast in place” knee-wall with bullnose corners. Wall to be reinforced with #4 O.C. into floor and 4” O.C. into the wall rebars to be tied together and epoxy anchored. Concrete knee wall to be primed, painted and sealed with moisture and mold proof epoxy paint. Color to match existing. • Furnish and install floor and wall ceramic tile to match existing. See A02 for Equipment Specifications. • Furnish and install ADA seat to manufacturer’s specifications and ADA Standards. Manufacturer: Grab Bar Specialists HDP Folding Shower Seat 63 Series or equivalent. See A03 for Equipment Specifications.