Specifications include, but are not limited to: Site work consists of preparing each destination pad to receive the portable building with below grade foundations, CMU pilasters above grade and anchorages, earthwork, utility trenching and backfill, and paved concrete sidewalks. Partial restriping of the existing parking lot at Salem Avenue Elementary School is included. Selective Demolition – Selective demolition includes removal of below grade concrete footings and above grade CMU foundation structure and treated lumber ramp and stair structures. Removal of electrical wiring to the existing portable buildings and conduit above grade is also included. Foundation and Structural – The project includes installing concrete footings to support the relocated portable buildings as well as concrete footings to support exterior walkway, stair, and ramp structures. Interior Finishes – Some disruption of interior finishes is expected as part of extending utilities from internal areas of the Salem Avenue Elementary School building outside to the new portable classroom locations. Contractor is expected to minimize disturbance to existing finishes to the greatest extent possible and repair/replace/repaint surface materials to match existing conditions. ACM Materials – Wall panels behind electrical panel at Sharpsburg State Owned Building has tested positive for ACM. They are not identified on the drawings. The project DOES include abatement of these ACM’s by the Contractor. Plumbing – The project does not include any plumbing work.