Specifications include, but are not limited to: 1. Project Management: Coordination of all aspects of the construction process including, but not limited to, subcontractor coordination and construction phasing. 2. Demolition of portions of existing sewage disposal system and abandonment of underground field as indicated on the drawings. 3. Construction of new onsite sewage disposal system including excavation and site preparation. 4. Demolition of arsenic backwash connection to the existing sewage disposal system and routing of backwash to interior trench drain. 5. Extension of sewage and electrical service to new sewage disposal system Facility. 6. Erosion and sediment control work during site disturbance. 7. Electrical inspections and certification shall be performed by The Middle Department or approved equal. 8. All other work noted on the drawings or specified herein.