Specifications include, but are not limited to: • All floor covers (outlets, expansion joints, etc) to be removed prior to demolition and abatement; install temporary protection for these locations during demolition and installation; and re-install floor covers to original locations after installation • Abatement of Asbestos Flooring performed by Licensed Asbestos Abatement Personnel with commercial liability insurance • Comply with all OSHA, EPA, MDE and other State Requirements regarding Abatement • Provide containment to comply with EPA and MDE regulations • Removal of all floor tiles and mastic glue down to concrete slab • Include Dust Control during Abatement • Legally dispose of all debris off site, including providing proper manifesting of ACM waste.